Quarterly surface plans for South African mines

From a new aerial view to surveyor-approved plan updates.

TerraDraft proposes polygon changes against the latest approved surface plan, gives the responsible surveyor full review control, and prepares an auditable output for DMR submission.

Cadence
Every three months
Review
Surveyor controlled
Output
DMR submission ready
TerraDraft concept interface showing a surface mine plan, aerial reference controls, mapped features, and plan metadata.
Early product concept for the focused surface-plan MVP
One focused workflow Aerial imagery in Traceable polygon proposals Professional approval

The first product

A smaller drafting burden for a recurring regulatory job.

Quarterly surface-plan updates require skilled, repetitive comparison between current aerial information and the mine's approved plan. TerraDraft is being shaped around that one practical job first.

The MVP does not attempt to replace CAD platforms or professional surveying. It concentrates on change detection, polygon drafting, review history and a controlled handover to the responsible surveyor.

See the site differently

Survey the change before redrawing the plan.

A current aerial view gives the review process a clear starting point. TerraDraft is being designed to turn visible change into structured polygon proposals that a surveyor can inspect and approve.

Aerial context first. Professional judgement throughout.

Concept film illustrating the aerial-survey context for TerraDraft

The quarterly workflow

Five clear steps with a human decision at the centre.

  1. 01Upload

    Add the latest aerial view and the current approved surface plan.

  2. 02Compare

    Align the source material and identify areas that appear to have changed.

  3. 03Propose

    Create traceable polygon updates without overwriting the approved source.

  4. 04Approve

    The surveyor reviews, corrects, accepts or rejects every proposed change.

  5. 05Prepare

    Package the approved plan and audit record for DMR submission.

01

Aerial-to-plan comparison

Bring new aerial imagery into a repeatable comparison against the approved surface plan.

02

Polygon change proposals

Turn visible change areas into editable proposals with source and version traceability.

03

Controlled review

Keep approval, correction and rejection decisions visible before any plan is released.

04

Submission record

Retain the evidence needed to understand what changed, who reviewed it and what was approved.

Professional control

AI assists the drafting. The surveyor owns the decision.

TerraDraft is designed as a human-in-the-loop workflow. It can identify, organise and propose changes, but it cannot approve a plan or replace the professional responsibilities of the appointed surveyor.

01

No silent changes

Proposals remain separate from the approved source until reviewed.

02

Explicit approval

Each release is tied to a responsible professional's decision.

03

Auditable history

Inputs, proposed edits, corrections and approval status remain traceable.

04

Focused compliance

The MVP output is validated around the quarterly DMR workflow.

Almost ready for launch

Be one of the first to use TerraDraft.

TerraDraft and Etashi are preparing the focused surface-plan MVP with mine and survey partners. Register your interest for launch updates, or contact us directly to discuss an early pilot.

Representative aerial view Latest approved surface plan Named surveyor reviewer DMR output requirements

Product facts

What the first TerraDraft product is and is not.

Who is TerraDraft for?

South African mines and survey teams responsible for recurring surface-plan updates and professional review.

Does TerraDraft replace the surveyor?

No. The product proposes drafting changes. The responsible surveyor reviews and approves the released plan.

Does it submit directly to the DMR?

The MVP prepares an approved plan output and audit record. Submission remains part of the mine's controlled professional process.

Is the wider concept included?

Not initially. Other plan types, deeper automation and field integrations follow only after the quarterly surface-plan workflow is proven.